Renovations trash cans in Varna and Dobrich Professional plastering, painting and upholstery services. Facilities include technical means for the realization of its core activities, own vehicles, appliances, machinery and equipment. We employ professionals with high qualifications for construction works. The company respects the wishes and requirements of our respected clients. Therefore, pay particular attention to the direct dialogue with them. Renovations in Varna and Dobrich Professional plastering, painting and upholstery services. Contact: Stanislav Georgiev E-mail: stanislav137@gmail.com Phone: trash cans 0895710077 trash cans
Laying brick is the most popular method for construction and renovation of buildings in the personal sector. Necessary materials and tools are readily available: not needed and any special knowledge and skills. You need to know the basic principles of work and with a little practice you will be good enough builder to build you own wall. In masonry used basically two types of bricks - type edinichki and fours. Quadruple trash cans brick has cavities in which air is retained, and this improves the thermal trash cans insulation properties of the walls. They are wall four times faster, saving and grout. With brick is mainly constructed exterior walls by placing them lying on the wide side. In internal walls shall be placed lying on the narrow side, but this wall is not particularly healthy. In walls built of bricks quad harder to dig channels for the electrical and plumbing. Single bricks were manufactured solid and hollow - lattice. Bricks have less strength, but are lighter and have better thermal insulating properties compared with the solid. Since grout penetrates the open adhesion between the bricks is significantly better than solid masonry and therefore becomes more robust. Still bearing walls must be masonry with thick solid brick, and in some cases worth of such bricks to build and partitions because they better separate the noise compared to the grid. 1 m3 masonry requires about 400 single bricks and about 280 liters grout, and 1 m2 of wall thickness half brick wall is 52 individual bricks. The bricks are interconnected with grout. It is made of lime, sand and water. It is necessary to know that the quick-lime hardens only when in contact with air, so with grout should not be Zidane thick stone walls or foundations that are under water. trash cans It is important lime and sand prior to measurement in order not to confuse proportions. For plain masonry using a solution of slaked lime or lime dust and sand volume ratio 1:3-4. To avoid later trouble with pebbles in the solution, the sand should be sieved through a sieve with a mesh size of 4-5 mm. For greater strength to the grout can be added to cement ratio cement, lime, sand, 1:2:8 or 1:1:6. Before commencing masonry must be made the necessary preparations. The construction site is cleared, the court of grout is placed about two feet from the building wall to the right of the worker; the same distance, but left stacked bricks. Necessary tools are placed in a convenient place so that they are handy. When the height of the wall exceeds 1 meter should be an appropriate scaffold. Foundation on which to build the brick wall must be flat and horizontal. First, determine the location of the two end bricks of the wall, and they are put in place on the grout layer. Between them stretched string Spread grout and rank the remaining bricks in a row. When the tension of the string must be followed two rules. Twine is stretched at the level of the upper front edge of the bricks; between him and bricks leave a distance of about 2 mm, so that it does not touch them. There are various devices for stretching the string, but lay terms this is the easiest of the two nails. trash cans In most cases, the procedure can not complete with all the brick that was placed initially. Observe the requirements of the brick ties and the location of the final brick to determine exactly plumb. This method is slightly slower, but safer and therefore more suitable for amateurs. Horizontality of the lines is checked with a spirit level and verticality of the wall and the location of the final bricks - to plummet. It is important that the vertical joints between the bricks trash cans also to be filled with a solution to weld. This is achieved in the following ways: - A brick be put in place on the forehead and from the set already brick Apply solution with a trowel. Then the brick is placed on the wall by gently moves aside and tapping with a hammer or handle of a trowel until it fits into place; - On the bottom row of bricks spread a thick layer of grout and placing the brick with her forehead scoop part of the solution
No comments:
Post a Comment